Milton PA North Arch Street Closure: What the Conservatorship Changes

The block of North Arch Street between Broadway and Walnut has been closed since May 9. That was the Saturday the bell tower on the former St. John's United Church of Christ at 18 N. Arch St. partly collapsed and dropped bricks into the alley beside it. PennDOT closed that stretch of Route 405 the same day. Its posted detour for through traffic runs along Broadway Street, north on Route 147, onto I-180 to Exit 1, and back along the Susquehanna Trail, Route 1007.

On Thursday, Oct. 15, Northumberland County Judge Frank Garrigan granted Milton Borough a conservatorship over the building. The ruling settles who is in charge of the building. It does not set a date for the barricades to come down. That date now depends on a process set by Pennsylvania law, and under that law a plan has to be approved in court before work on the building can begin.

Five months of citations with no way inside

From May until the hearing, the borough could write citations but could not legally go inside the building. The Daily Item reported testimony that the property drew 98 code citations between May and the hearing and that none of them produced any repairs. Zoning officer Alec Klingler photographed the outside of the building on the day of the collapse and several times afterward. He had no interior photos because the borough had no access.

The borough's one look inside came through a search warrant. According to The Standard-Journal, engineer Gregory Decker of Barry Isett and Associates made his first inspection on May 22 after the warrant was obtained. Council voted on July 8 to authorize spending up to $220,000 on the property. Decker's rough estimate for the work was $150,000.

So the borough had set aside the money by mid-July. What it lacked was legal authority to hire a contractor to work on a building it did not own. The conservatorship supplies that authority. Borough solicitor Michael Wiley told the Daily Item that the court order "allows the borough to have access to the property, evaluate the property and then make a suggestion to the court with a final plan on what should happen to the property."

What the engineer says has to come down

The court documents quoted by The Standard-Journal describe a brick tower about 20 feet tall with "numerous loose and unstable brick units" around the collapse area, damaged heavy timber framing behind the louvers, and missing mortar on all four sides near the top. Barry Isett's recommendation is specific about the order of the work:

"The demolition should proceed from the top down and include all brick masonry, wood louver and damaged wood-framing elements. Once the bell tower has been safely demolished down to the solid brick masonry wall height... temporary bracing members should be installed from above to ensure lateral stability of the walls at their upper termination."

The final step in that recommendation is a temporary roof and enclosure to protect the building from weather. The recommendation covers the tower and stabilizing the walls. It does not call for tearing down the whole church. The cornerstone on the building reads 1887. At the hearing, Judge Garrigan said, "I appreciate the historic buildings. At a certain point, you have to see how far gone it is." He described the conservator's job as deciding "what the fiscally responsible thing to do is."

The same documents explain why the street has stayed closed this long. They say access to the adjacent alley and parking lot "should be strictly prohibited," and "Access to Arch Street should remain closed and access to the surrounding exterior site should remain restricted." The engineer ties the closure to the loose brick. The road can reopen only after the tower comes down, and the tower can come down only after the court approves a plan.

What comes next for the building

The conservatorship comes from Pennsylvania's Abandoned and Blighted Property Conservatorship Act, Act 135 of 2008, signed Nov. 26, 2008. Read alongside what borough officials said after the hearing, some of the next steps look like this:

  1. Evaluation and bidding. Borough Manager and Police Chief Curt Zettlemoyer testified that the building needs a full evaluation and that the work will be put out for bid.
  2. A written plan. Section 6 of the Act requires the conservator to prepare a final plan for dealing with the building. If no workable rehabilitation plan exists, the alternatives it lists include "the closing, sealing or demolition" of the building. The plan has to include costs, financing and the work proposed.
  3. Court approval. The court either approves the plan or requires changes. Section 6(b)(4) ties carrying out the plan to "approval by the court."
  4. Work, then reopening. Wiley said the borough will "work as quickly as we can" to secure the site and reopen Route 405 in front of the building.

The borough has not announced a bid date, a demolition date, or a reopening date. The borough has said the evaluation and bidding still lie ahead.

Who pays for the work

The $220,000 that council authorized in July is borough money, and the borough's budget did not plan for it. Zettlemoyer testified, "This is definitely something the borough did not prepare for when preparing our budget."

The Act gives the conservator ways to recover those costs. Section 6(a) lists a conservator's powers, which include contracting for repairs, applying for grants, borrowing, and selling the building.

This is a summary of a public statute for neighbors following a local story. It is general information, not legal or financial advice. Anyone with their own stake in a property like this should talk to an attorney about their situation.

The neighbors behind the barricades

The closure affects more than through traffic. At the hearing, Zettlemoyer named the places hit hardest. Customers cannot reach the front of The Standard-Journal, and access to its front dock is restricted. Access to Speedy's Bar and Grill and to Milton Developmental Services is also directly affected. The newspaper's office is at 21 North Arch Street. In May, the Milton Fire Department parked its aerial truck in the newspaper's parking lot so firefighters could watch the tower.

"We have a main thoroughfare in the borough that is closed… There is a detour in the middle of town. It's a major inconvenience," Zettlemoyer testified. "Overall, the downtown has been dramatically impacted by this." Mayor Tom Aber and council members Jamie Walker, Cindy Fawess and Linda Meckley attended the hearing in Sunbury.

The first big downtown night since the ruling

Downtown's next big night out is Milton Winterfest. Holiday on Broadway runs Friday, Dec. 4, from 5 to 9 p.m., with the Santa Toy Run, the tree-lighting ceremony, food and craft vendors, live reindeer and photos with Santa. Breakfast with Santa follows on Saturday, Dec. 5, from 9 to 11 a.m., with the location still to be announced. Santa's House on Broadway is open weekends from Dec. 5 through Dec. 20, Fridays 5 to 8 p.m. and Saturdays 1 to 4 p.m. Professional photos are free on Dec. 12 and Dec. 19.

Broadway is the Route 254 end of the closed block and the first leg of PennDOT's detour. No one has said whether North Arch will be open by Dec. 4. The borough's next public step is a filed plan, and the court calendar will show when that happens.

Brett Barrick has lived in the Lewisburg area since 1972 and practiced law before he went into real estate. If you own property in downtown Milton and want a calm, careful look at what nearby changes like this could mean for your home, Brett Barrick can help. Work with Brett and request a free home valuation.

Work With Brett

Get assistance in determining current property value, crafting a competitive offer, writing and negotiating a contract, and much more. Contact me today.

Follow Me on Instagram